6.12. Using resource model

With Pure Variants 7.0.0, resource models were introduced. Resource models are used to share resources via the Pure Variants model server. Resource models are available in both local and remote projects.

Each project can have a maximum of one resource model and typically has the name of the project. The resources stored in a resource model can be used in the same project and in referencing projects.

Currently, the following resources are supported:

A resource model can be created by migrating an existing Pure Variants project. All Java scripts are copied into the resource model, and corresponding resources are created. The files are not modified or deleted.

To edit the resources in a resource model, the resource model must be opened either by double-clicking or expanding it in the Projects View.

To add a filter to a resource model, the normal filter dialog is used.